Stuckey Electrical Contractors was engaged by Kennett Builders to undertake the electrical services for the extension and redevelopment of the existing terminal. The new terminal has been operating since October 2020.
Mount Gambier’s new airport terminal has been designed to impress travellers now and into the future, being sure to accommodate anticipated growth in the local region.
A smart lighting control system has been installed to the Mount Gambier Airport Terminal using a combination of Clipsal C-Bus and Syncromesh Lighting Control. This system delivers seamless operation for its users as it can create ‘scenes’ throughout the day to ensure optimum lighting as well as energy efficiency.
Stuckey Electrical Contractors Clean Energy Council Accredited designer and installers fitted a new 30kW solar system. This system has been installed to lower running costs, utilise a renewable source of energy and reduce impact on the environment.